2/n @VWGroup boasted about having "secured" enough cell supply for 4.5m BEVs through 2023.

If each of its BEVs has a 70kWh pack, that's 315GWh of supply, or 75% of planned capacity at LGC + CATL, the world's 2 largest suppliers.

Aside from VW, 15 other major OEMs are in line. pic.twitter.com/AZt7twul4x

— Motorhead (@BradMunchen) September 29, 2020